Parish Center Plans

Information reguarding our future parish campus has been mailed to parishioners.  Included in that mailng is a survey listing the various options avilable.  Please fill out your survery and return to the Parish the Office.  Your input is important!  We are in the planning phase of this project, we encourage parishioners to dream big and share those thoughts with our planners!

The current plans and options are below.

Option 1:

Do nothing $0

 Option 2:

Drawings S1, 9, 10, & 11

* Remove old Parish Center.

* Construct new parking lot on land vacated by old Parish Center.

* Remodel existing Assumption Arena to house parish offices, parish classrooms, and the Knights of Columbus.  The Event Center will be remodeled and reduced to 4, 868 sq. feet, with adequate toilet facilities.  The Rummage Room will be reconstructed and enlarged on the main floor of the building.  this will be accomplished by removing the stage and constructing a new floor system at the same elevation as the main floor.  This will provide ADA access at street level, no more stairs.  Building 17, 971 sq. feet.

* Construct a new maintenance building to house lawn and snow removal equipment.  Building 600 sq. feet.       ***Opt. 2 Est. Cost $2, 362,900.00

 

 

 

 

 

Option 3:

Drawings S, 1, 2, & 6

*Remove Old Parish Center.

*Construct new parking lot on land vacated by old Parish Center

*Construct Parish Center to house Parish Offices, Parish classrooms, and small meeting room.  Building 7,000 sf.

* Construct a new Maintenance Building to house lawn and snow removal equipment.  A portion of the building will be cold storage for the Rummage Room and a drop0off area for donation.  Building 1,000 sf.

* No construction planned for the Assumption Arena.                                                                                                                                      Est. Cost Opt. 3:  $1,670,448.00

  

Option 4:

Drawings S, 1, 2, 3, 4, 5, & 6

* Construct all items in Option 3 above.

* Remodel the Assumption Arena to house an Event Center containing an open display area of 6, 486 sf., with adequate toilet facilities.

* Rummage Room will be reconstructed and enlarged on the main floor of the building.  This will be accomplished by removing the stage and constructing a new floor system at the same elevation as the main floor.  This will provide ADA access at street level, no more stairs.                       Est. Cost Opt. 4:  $3,443,576.00

  

Option 5:

Drawings S, 1, 2, 3, 4, 5, 6, 7, & 8

* Remove old Parish Center

* Construct new parking lot on land vacated by old Parish Center

*Construct new Parish Center to house Parish Office, Parish Classrooms and small meeting room.  Building 7,00 sf. 

*Remodel the Assumption Arena to house an Event Center containing an open display area of 5, 520 sf. with adequate toilet facilities.

*The Rummage Room stage area will remain as is with no demolition work.  The Rummage Room will be expanded to the South into the Event Center with the Floor at Street level for ADA access.  This will add an additional 1, 808 sf.  A new entry lobby will be constructed on the East side of building near the Kitchen Entry.

* Construct a new Maintenance Building to house lawn and snow removal equipment.  Building 1,000 sf.                       Cost Opt. 5:  $3,355,710.00

  

Option 6:

Drawings S, 1, 2, 6, & 12

* Construct all the items in option 3 above and the construction on drawing 12.

*No cost has been determined for this option.  The construction on drawing 12 is minimal and depending on fund raising this might be a good addition to option 3.